Preparatory checklist for CBS

(I)  Pre Requisites

1.  A  node  with  Windows  7  along  with  SQL2005/  SQL  2008  to  be  kept  ready  for uploading data through SFTP server. Latest Antivirus software has to be installed in this node. This node will be used as backup server.

2.  Download Filezilla software from the below said link and the install the same in this node.

3.  Restore post , sign ,sosb, bpro, blog in the backup server (i.e Node mentioned in Slno.1) Check whether the sanchay post software is working with this Sql server connectivity in this node only
(Caution : No change is required in the original server in respect of SQL version and the regular server will continue to serve the Sanchaypost network)

(II)  Pre requisites – Data cleansing

1.  Scheme-wise,  account-wise  balance  agreement  has  to  be  completed  and consolidated balances certified by the postmaster & the Divisional head.
2.  100% manual records have to be digitized using Sanchaypost Ver 7.5 and Manual Data Entry tool published in SDC portal.
3.  4 Years history data of NSS-87 should be completed using the Manual Data Entry Tool said in item(2) 
4.  Manual data relating to KVP, NSC 8 and NSC 9 should be updated in Sanchaypost 7.5
5.  On the date of actual migration this manual data should have the updated entries deleting the details of KVP/NSCs discharged and accounts closed.
6.  Many post offices are in the habit of discharging the certificates by selecting the option  “Issued  at  other  office  /  Manual”   even  though  these  certificates  were issued in the same office. 
7.  This discrepancy could be viewed using, DB  Analyzer--> Reports—live account. Post  offices  are  instructed  to  ensure  that  the  live  accounts  list  so  generated should match with the office records. The certificates already discharged are to be cleared using online discharge option.

(III)  Steps to be followed for Go Live

(Points 1 to 8 to be performed in the Live Server)
1.  Download the  Latest DB Analyzer including  (DBA+ Tool dt.  14-04-2014)  through the link below and execute the same. 
2.  Each and every option in Database Discrepancies, CBS Additional Discrepancies and  CBS  Discrepancies  (II)  for  all  schemes  in  DB  Analyzer  have  to  be  checked and discrepancies cleared. 
3.  All agents (ie. MBKBY ,PRSS  & SAS  Agents) should be linked with PO Savings Account Number  and PanNumber. Provision available in the latest DB Analyser  –Miscellaneous  option  to  check  the  Agents  linked  /  Not  linked  with  Saving Accounts.
4.  It  is  also  requested  to  ensure  that all  the  accounts  closed  under  Claim  closure status  are  marked  as  ‘CLOSED’  in  Ledger/Index  tables,  as  the  accounts  having remarks as ‘Claim closure’ will be migrated as Live accounts in FINACLE. 
5.  During the Go-live migration, it is requested to change the BO details. Please verify the BO details today if applicable and take necessary corrective actions before Go-live. It is very difficult to accommodate due to stringent timelines.
6.  Take backup of Post Database. If  any  problem  faced  in  the  coming  process  you  have  to  restore  the  post database.  If  you  fail  to  take  backup  dmcc  will  be  not  provide  any  solution thereafter.
7.  Download the Premigrationtool _2_31  dt.16-04-2014 and execute the tool from the below said link
Check  for  sample  data  whether  it  has  not  effected   correct  data  like name,address.etc.  If  any  there  is  any  major  change  in  correct  data  restore  the database and contact DMCC, Chennai for solution.
8.  Execute DPT Tool 2.9  and DB Analyzer consolidation report and ensure that zero discrepancy exists.

DPT Tool 2.9 Link :

9.  Download the SP-Link Aadhaar Number.exe from the below said link and execute the same to create UIDAI related tables.
10.  Ensure Agt_act and UIDAI table exists in the Post database.(this will get created when  we  use  option  to  link  adhaar  and  linking  agent  with  SB  account  number 

11.  Check the Database consistency using DB  Analyser for Post and Sign database and ensure that there is no error in the database. If error is  reported  kindly send email to chennaidmcc@gmail.com for solution. This is a very important step as it is related to data integrity of post and sign.